He's digging the hole now for the propane tank and the next picture shows the tank in the ground and the gas company there to run the line to the house. They fill it up to 80% so there's room for vaporization. We will be on a route and they will top it off monthly or every two weeks during the months we need heat. We can't imagine that we will use much since we have propane in the MH and haven't bought any since December and we only have a 70 gal tank. Right now it reads 46% full!! Of course we only cook with it now.
The tank is all hooked up now and all he had to do is hook it up to the system that will phone the home office if there is a problem, get the pump up and running and cover it up. We will have to ad chlorine occasionally. Of course, we will need electricity to run the pump and we have none at the moment!
The equipment guy (John) put lots of the rock from the holes he dug in the low area where the rv drive would be, then he put dirt on top so now there is a road there. The dump trucks came in Friday and unloaded 4 to 5 more loads of dirt for the drain field and drove across the rv drive. If it will hold those trucks, it should be fine for the rv.
We took this picture from the cul-de-sac so you can see how Terry will be backing in. Also, any of you rver's who want to visit.
Well, that's it for today. Hope you all have a great end of summer.
Sandy
